top of page
Fabric2024Portfolio_SurfLabs_UV-001.jpg

TYRA HQ 2

The plan to expand the campus for bio-tech company TYRA, from their current lab space to the north included the adaptive re-use of the existing auto shop, into a new laboratory, conference room with open offices. The scope also included construction of a new 2-story office building with communal break room, and a third multi-purpose space equipped with restroom and shower. To manage the parking program, vehicle lifts were installed to double to capacity on the site.

Developer

Fabric Investments

 

Design 

WAL Designs (AOR)

G Coleman Architect (Design)

Construction

C2 Building Group

Fabric2024Portfolio_SurfLabs_UV-004.jpg
Fabric2024Portfolio_SurfLabs_UV-007.jpg
Fabric2024Portfolio_SurfLabs_UV-009.jpg
Fabric2024Portfolio_SurfLabs_UV-011.jpg
Fabric2024Portfolio_SurfLabs_UV-010.jpg
Fabric2024Portfolio_SurfLabs_UV-008.jpg
Fabric2024Portfolio_SurfLabs_UV-002.jpg
Auto shop.jpg
bottom of page